| No. |
Location |
|
Description of works |
|
Project Image |
| |
Year 2006 |
|
|
|
|
| 1 |
RC Wall Coring and Restoration Work at CCP CWP No.1 Pit |
|
Stitch Coring |
|
|
| 2 |
Proposed
Addition and alteration to the existing factory on lot 4757 (Plot A13845)MK5
at No.231A Pandan Loop |
|
Post Tensioning Work |
|
click here |
| 3 |
Proposed Repair Work to No. 5 Dry Dock Pump Room at Tanjong Kling,
Shipyard |
|
Concrete Repair |
|
|
| 4 |
Proposed Repair work to No. 2 Dry Dock Pump Room at Jalan Samulun,
Shipyard |
|
Concrete Repair |
|
|
| 5 |
Proposed Redevelopment of Changi Prison Cluster B Complex at Upper
Changi Road/Changi North Way |
|
Post Tensioning Work |
|
|
| 6 |
Proposed Repair Work to No.2 Dry Dock Pump Room at Jln Samulun |
|
Stitch Coring |
|
|
| 7 |
Proposed Stitch Coring at 396 Alexander Rd -UOB Bldg Carpark |
|
Stitch Coring |
|
|
| 8 |
Proposed Repair Work to No. 5 Dry Dock Pump Room at Tanjong Kling,
Shipyard |
|
Pre-packed Grouting |
|
|
| 9 |
Repair to defective/spalling concrete surface at CD3 structure at
Shell Bukom |
|
Concrete Repair |
|
|
| 10 |
Repair Damaged Concrete at CD5 Exchanger Structure at Shell Bukom |
|
Concrete Repair |
|
|
| 11 |
Concrete Removal & Replacement at Senoko Power Station |
|
Stich Coring & Concrete Repair |
|
|
| 12 |
Repair to Defective/Spalling Concrete Surface for Column at CD3 Structure
at Shell Bukom |
|
Concrete Repair |
|
|
| 13 |
Repair of Spalling Concrete at CD5 Exchanger Area Zone C at Shell
Bukom |
|
Concrete Repair |
|
|
| |
|
|
|
|
|