1 Repair Work to Pump Room (Deck 1 & 2) at Jurong Shipyard   Concrete Repair    
2 TGU 11.7m-13.2m high f/f north wall external pre-packed aggregate grout repair at Shell Bukom   Prepacked Grouting    
3 Coring work   Coring work    
4 Repair to defective concrete structure at CD5 Pumpstreet Structure at Shell Bukom   Concrete Repair    
5 Repair concrete structure at CD5 Exchanger Area at Shell Bukom   Concrete Repair    
6 Investigate/repair spalled concrete prestressed beam Wharf 10 at Shell Bukom   Concrete Repair    
7 Repair to spalling concrete for building at Senoko Power Station   Prepacked Grouting & Patch Repair    
8 Bridge 3 , Pipe rack and HF Jetty Maintenance Protective coatings to steel piles at Shell Bukom   Protective coatings to steel piles    
9 Bridge 3 , Pipe rack and HF Jetty Maintenance Epoxy Crack repair and protective coatings to concrete underdeck at Shell Bukom   Epoxy Crack Repair, Protective coatings to concrete underdeck    
10 Bridge 3 , Pipe rack and HF Jetty Maintenance Prepacked Grouting Repair and Cementitious Crack Repair at Shell Bukom   Prepacked Grouting and cementitious crack repair    
11 TGU RAM Severe 12m High South Wall External at Shell Bukom   Prepacked Grouting    
12 TGU RAM High 8.6m Beams GL A4-B23 at Shell Bukom   Prepacked Grouting    
13 TGU RAM High 5.5m Beams GL A4-B23 at Shell Bukom   Prepacked Grouting    
14 TGU RAM Severe 5.5m High Beams A5/B5, A7/B7, f/f A10/A11/A12, E7017-4 slab repair at Shell Bukom   Prepacked Grouting    
15 Repair to defective concrete structure (RAM H6) at CD5 Complex at Shell Bukom   Prepacked Grouting    
16 Repair to damaged concrete structure at CD3/LND Piperack at Shell Bukom   Prepacked Grouting to Pipe Rack Pillars    
17 Reconstruction of Slab between E1306/E1309 at Shell Bukom   Hacking of existing slab and recasting    
18 Repair to cracked edges at circular slab openings for C2501, V2501, C2506 & C3507 at CD 3 Complex at Shell Bukom   Prepacked Grouting to Slabs edges    
19 Proposed erection of 3-sty place of worship with 1 basement carpark as an extension to the existing 2-sty church at 5 Tavistock Ave   Post Tensioning Work    
20 Repair to Defective/spalling concrete surface at column and slab at HVU (LOC) Complex at Shell Bukom   Prepacked Grouting to columns and slabs    
21 Repair to defective RC stumps at Battery limit gridline 1-5/P-R at Shell Bukom   Prepacked Grouting to column stumps    
22 Repair to Defective/Spalling Concrete surface at CD5 complex, Shell Bukom   Prepacked Grouting to columns and beams    
23 Repair to Defective/Spalling Concrete surface for column & beam at PL-3 complex at Shell Bukom   Prepacked Grouting to columns and beams, including temporary props using Steel I-Beam    
24 Repair to Defective/Spalling Concrete surface for column & beam at PL-3 complex at Shell Bukom   Prepacked Grouting to columns and beams, including temporary props using Steel I-Beam    
25 Temporary Propping Works for Repair to Pillars at TGU Complex (S7 Category) at Shell Bukom   Temporary Propping Works for Repair to existing 9 columns using SHS props