No. Project   Description of works Project Image
  CURRENT PROJECTS (YEAR 2009 & 2008)
1 Proposed Construction of Roads, Drains and Sewers off Woodlands Ave 12 (Phase 2) Civil Engineering Works  
2 Upgrading of vehicular bridges at 5 locations Civil Engineering Works click here
3 Widening of Commonwealth Drive and Tanglin Halt Road / Construction of outlet drain at Commonwealth Drive and Tanglin Halt Road Civil Engineering Works click here
   
  1997
1 Jalan Kelawar   Design and build retaining wall system  
2 Temasek Polytechnic   Adventure Training Facilities  
3 ITE at Ang Mo Kio   Adventure Challenge rope course  
4 Lenkong Empat   Design and build retaining wall system  
5 OCBC Centre   Retrofitting of mosaic tile facade  
 
  1996
1 St. John~{!/~}s Island, Pulau Hantu and Pulau Sebar Laut   Design and construction of 3 passenger ramps  
2 Singapore Polytechnic   Adventure Rope Challenge Park  
3 MRT tunnel lining   Testing of MRT tunnel lining segments  
 
  1995
1 Jalan Ampang   Design and construction of retaining wall system  
2 No. 9, Tuas Avenue 10   Extension to existing factory  
3 Camden Park   Design and construction of retaining wall system  
4 Outward Bound School at Pulau Ubin (Camp 1)   Construction of adventure training facilities  
     
  1994  
1 Mobil Refinery Jetty   Construction of two passenger and vehicle ramps  
2 Settenham Road   Restoration of fire damaged residential building  
3 Sarimbun Scout Camp   Construction of adventure training facilities  
4 Night Safari Zoological Gardens   Suspension bridge and moats for animal exhibit  
5 Parbury Avenue   Design and construction of retaining wall system  
6 Coronation Road West   Construction of retaining wall system  
         
  1993      
1 Eng Choon Huay Kwan Building, 105 Amoy Street   Strengthening and retrofitting works  
2 Outward Bound School at Pulau Ubin (Camp 2)   Construction of adventure training facilities  
3 Shell Eastern Petroleum   General civil engineering  
4 Changi Beach Club   Construction of jetty and sea front promenade  
5 10, Senoko Crescent   Extension to existing factory  
     
  1992
1 HDB~{!/~}s Woodlands Contract Number N3C4   Concrete cutting and strengthening for the HDB conversion project  
2 Shell Eastern Petroleum   General Civil Engineering  
3 Changi Logistics   Erection of precast columns  
4 Pioneer Sector 2   Erection of precast columns  
         
  1991
1 Pulau Bukom   Upgrading works at the Marine Building