| No. |
Project |
|
Description of works |
|
Project Image |
| |
Year 2010 |
|
|
|
|
| 1 |
Marina Bay Financial Centre Phase 2 - Tower 3 |
|
Chemical Grouting Works to cut down water
ingress between CST and Tower 3 |
|
|
| 2 |
Jurong Island Drainage Extension at Area 3B5 |
|
Cement Grout Pile Works |
|
|
| 3 |
Proposed Contract 919 - Design and Construction of Stations and Tunnels at Botanic Gardens and Stevens for
Downtown Line Stage 2 |
|
Recharge Well |
|
|
| 4 |
The Interlace |
|
Soil Nail Works |
|
|
| 5 |
Construction of A RC Bldg., Steel Doors and Ancillary Works at TAB |
|
Grout Mix Pile Works |
|
|
| 6 |
Marina Bay Financial Centre (Tower 3) - Grouting Between Existing CBP and D-Wall For Phase 1 - Phase 2
Basement Connection |
|
Chemical Grouting Works |
|
|
| 7 |
Contract 482 - Design, Construction and Completion of Marina Coastal Expressway - Ground Improvement at
Zone C1A |
|
Jet Grouting Works |
|
|
| 8 |
Proposed Redevelopment Of Overseas Union House And Change Alley Aerial Plaza On Lots 61, 87, 102Pt &
186Pt Ts 30 At 50 Collyer Quay (Downtown Planning Area) |
|
Micropiling Works, Cement Grout Pile Works
and Chemical Grouting Works |
|
|