Presscrete Engineering
Presscrete Engineering
 

how we work
No. Project   Description of works   Project Image
  Year 2010        
1 Marina Bay Financial Centre Phase 2 - Tower 3   Chemical Grouting Works to cut down water
ingress between CST and Tower 3
   
2 Jurong Island Drainage Extension at Area 3B5   Cement Grout Pile Works    
3 Proposed Contract 919 - Design and Construction of Stations and Tunnels at Botanic Gardens and Stevens for
Downtown Line Stage 2
  Recharge Well    
4 The Interlace   Soil Nail Works    
5 Construction of A RC Bldg., Steel Doors and Ancillary Works at TAB   Grout Mix Pile Works    
6 Marina Bay Financial Centre (Tower 3) - Grouting Between Existing CBP and D-Wall For Phase 1 - Phase 2
Basement Connection
  Chemical Grouting Works    
7 Contract 482 - Design, Construction and Completion of Marina Coastal Expressway - Ground Improvement at
Zone C1A
  Jet Grouting Works    
8 Proposed Redevelopment Of Overseas Union House And Change Alley Aerial Plaza On Lots 61, 87, 102Pt &
186Pt Ts 30 At 50 Collyer Quay (Downtown Planning Area)
  Micropiling Works, Cement Grout Pile Works
and Chemical Grouting Works