Presscrete Engineering
Presscrete Engineering
 

how we work
No. Project   Description of works   Project Image
  Current Projects (Year 2009 & 2008)        
1 Marina Bay Sands 8402 Project   Chemical Grouting to Cut Down Water Ingress    
2 MRT Downtown Line Stage 1 - C907   Cement Grout Pile    
3 Proposed New Erection of 7-Storey Comm'l Bldg w/ 3 - Basements at Orchard Rd/Somerset Rd   Shotcreting Works and Soil Nailing Works    
4 MRT Contract 907 - Gate D Taisei Site, Marina Bay   Chemical grouting Works to Cut Down Water Ingress   click here
5 Hacking Off Existing D-Wall @ MB Sands IR Project   Chemical grouting Works to Cut Down Water Ingress    
6 Proposed Slope Improvement Works at Cluny Hill   SoiI Ivestigation, Soil Nails and Monitoring Works    
7 Chemical Grouting Works at C90 -Downtown Line Stage 1   Chemical Grouting Works   click here
8 Marina Bay Financial Centre (Commercial) - Parcel A6   Chemical Grouting Works    
9 Scotts Square   Chemical Grouting Works    
10 Micropile inside Turbular Pile at Sembawang Shipyard   Micropiling Works   click here
11 Marina Bay Financial Centre - Area 3   Chemical Grouting Works    
12 Deep Level Datum at C9118A - C905   Deep Level Datum   click here
13 Marina Bay Financial Centre (Commercial)   Jet Grout Piles and Chemical Grouting Works   click here
14 Ultimate Load Test using GA Reaction System at No.32 Jurong Port Road   Ground Anchor Reaction System   click here
15 Pressure Grouting at C908   Pressure Grouting Works    
16 Marina Bay Residence (BFC) / Knock Out Panel at UPN & Parcel A7   TAM Grouting Works / Chemical Grouting Works    
17 The Sail @ Marina Bay   Drilling through obstructions    
18 C852A - Lorong Chuan MRT   Jet Grouting Works    
19 Marina Bay Sands IR - Art Science Museum Project   Jet Grouting & Chemical Grouting Works   click here
20 C909 - Downtown Line Phase 1   Jet Grouting Works   click here
21 Marina Bay Financial Centre (Commercial)   Micropiling Works   click here
22 Contract 856 - Labrador Park Station, Telok Blangah Station and Harbourfront Station   Micropiling Works / Ground Anchor   click here
23 Changi Newater Reclamation Plant   Jet Grouting Works    
24 Grouting Works to Seal the Voids between Sheetpile wall and Jacking Pipes for Recovery Works at ECP   Pressure Grouting Works    
25 Laying of Twin 900mm Dia Pipeline From Changi to Bedok Newater Factory   Chemical Grouting Works    
26 Marina Bay Residence (BFC)   Micropiling Works    
27 Marina Bay Financial Centre (Commercial)   Chemical Grouting Works    
28 Retail Development of Somerset Central   Micropiling Works   click here