1 Proposed A&A to Existing Shipyard at No.15 & No.5 Benoi Rd   Micropiling Works    
2 Slope Stabilization Works at Bukit Panjang Link and Portsdown Gate   Slope Stabilization Works   click here
3 Proposed Upgrading & Addition of Process Equipment to Existing Single User Polystyrene Plant at 53 Tuas Crescent   Micropiling Works    
4 Proposed Condominium Housing Development at Telok Blangah Road - The Reflections at Keppel Bay   Soil Nailing, Micropiles, Shotcrete and Grouting Works   click here
5 Micropiling works at Bukit Batok Pavillion Park Phase 2A, 2B and 2C   Micropiling Works   click here
6 Proposed Erection of a 15-Storey Residential Apartment at 18 St. Michael's Road   Jet Grouting Works    
7 Term Contract for Campus Wide Slope Stabilization in NUS   Slope Stabilization Works    
8 No.3 Namly Drive   Micropiling Works   click here
9 The Sail @ Marina Bay   Chemical Grouting    
10 Proposed A&A to Existing Invista Adipic Site Involving Erection of no. 1 Ammonia Storage Tank and Ancillary Facilities at 1 Sakra Avenue, Jurong Island   Vibration Monitoring Works    
11 Improvement to Joan Road Outlet Drain   Instrumentation Works    
12 Proposed A&A works to Maghain Aboth Synagogue at Waterloo Street   Shotcreting Works   click here
13 Temporary Cofferdam for the Construction of Serangoon East Dam   Tie Back Anchor   click here
14 Building Works for the LUP contract 35   Instrumentation Works    
15 Repairs & Redecoration and Improvement Works to 19 Blocks at Tanjong Pagar Division   Micropiling Works    
16 Proposed Erection of A Block of 5 Storey Flats at Koon Seng/ Pulasan Road   Jet Grouting Works   click here
17 Proposed New Erection of Underground Sprinkler Tank Room & Internal A&A at NUH   Soil Nailing Works    
18 Permanent Ground Anchor at Gul Road   Ground Anchor   click here
19 Pumping Tests at Sentosa IR   Drilling of Boreholes   click here
20 Proposed Erection of 2-Storey Detached Dwelling House with Basement and an Attic at BishopGate   Micropiling Works   click here
21 The Inspra Condominium at Martin Road   Soil Nail and Shotcreting Works   click here
22 Proposed Micropile System to replace Bore Piling System at Pavillion Park, Bukit Batok Road (Unit Type M5 - 10 units)   Micropiling Works    