No. Project   Description of works   Project Image
  Year 2006        
1 Proposed Addition of Electrical Substation to Existing Utilities & Terminal Complex at 51 Sakra Avenue   Micropiling Works  
2 Pulau Ular Reclamation Project - Stability of Permanent Slope at CH B West Interface   Micropiling Works (cement grout column)   click here
3 Settlement Monitoring at Office of Life Sciences, NUS   Instrumentation and Monitoring works    
4 Supply and Installation of I-beam at TCA-1A Pasir Panjang Viaduct   Supply and Installation of I-Beam    
5 Cable Tunnel harbour drive at labrador - rental of equipment for cementious grouting   Grouting Works    
6 Proposed Additions and Alterations to SEG and STA Labs at Republic Polytechnic   Micropiling Works    
7 Proposed Slope Stabilisation Works at Shell's Retail Station at no. 385 Alexandra Road   Soil Nailing works   click here
8 134A Jalan Pari Burong   Clearance and disposal of debris from failed slope    
9 Toe Pin Works at Jurong Port   Toe Pin Works    
10 Soil Nailing Works at No.8 Joan Road   Soil Nailing works   click here
11 Singapore Parallel Train Project - New Polymer Storage - Jurong Island   Prefabricated Vertical Drain & Instrumentation    
12 Proposed Erection of A Block of 17 Storey Flats at 19 Lincoln Road
  Jet Grouting Works   click here
13 MRT Circle Line Stage 3 C852 - Construction & Completion of Serangoon Interchange Station including Tunnels   Micropiling Works (install only)   click here
14 Installation of Deep Level Datum at IR Project   Drilling of Boreholes    
15 Ground Anchor for Jurong Point   Ground Anchor & Concrete Waler Works   click here
16 Installation of Cathodic Protection at SAR Fire Water Lines   Drilling of Boreholes & Micropiling Works    
17 Proposed Storage Area for Micron Semiconductor at Bendemeer Road   Micropiling Works    
18 Proposed Residential Development at No. 8 Balmeg Hill   Soil Nail, Micropile and Instrumentation Works   click here
19 Proposed Erection of An Overhead Pedestrian Bridge at Alexandra Rd and Telok Blangah Hill Park   Micropiling Works   click here
20 Soil Investigation Works at Paterson Lodge   Soil Investigation Works    
21 MRT Circle Line C856   Ground Anchor, Micropile,Soil Nail & Rock Bolts   click here
22 No. 231A Pandan Loop   Soil Investigation Works    
23 Proposed Extension of Pandan I Pumping Station, Raw Water Pipelines and Associated Works   Micropiling Works   click here
24 Proposed A Block of 8 Storey Residential Flat Building at Handy Road   Ground Anchor, Guniting & Soil Nail   click here
25 Micropile Testing at NUS   Micropile Testing    
26 Proposed Condominium Development at Yio Chu Kang Road / Ang Mo Kio Avenue 4 (The Calrose)   Soil Nailing works    
27 Installation of horizontal drains at Hume Ave.   Horizontal drains    
28 Uprading at Blocks 709-715 at Bedok Reservoir Road   Instrumentation work    
29 No. 63, 63A Dunbar Walk   Instrumentation work    
30 THE MAYLEA, Proposed Condominium at 242 Pasir Panjang Road   Ground Anchor & Soil Nail Work    
31 Proposed OMEGA Civil and Piling Works at 21 Sakra Ave Jurong Island   Micropiling    
32 MRT Circle Line Stage 4 C854 Project (Adam Road Station)   Installation of toepins at Diaphragm wall panel 17 and 18    
33 Instrumentation Monitoring works at NUS Campus   Instrumentation    
34 DTSS-Crawford link sewers - Contract 1   Instrumentation    
35 Proposed A&A to Existing Electrical Sub-Station on Lot 1316M &7966K MK 18 at 22 Ang Mo Kio Indus. Park 2   Micropiling    
36 Temporary Stabilization of Base Excavation & Instrumenation works at No 68 MacKenzie Rd   Micropiling , guniting & instrumentation works