No. Project   Description of works   Project Image
  Year 2005        
1 Proposed grouting works at MRT Circle line stage 4 C854 project   Grouting    
2 Proposed addition of 2 modular operating theaters at mount alvenia hospital   Instrumentation Monitoring Works    
3 Exxonmobil Sop 9th Furnace Project-Grouting works   Rent of grouting equipment    
4 MRT Circle line Stage 4 C854   Removable ground Anchors    
5 Proposed Erection of a 5 storey building at Sechool of mechanical and aerospace Engineering At NTU   Consultattion works    
6 DTSS-Tanah Merah Link Sewer   Jet Grouting    
7 Proposed ExxonMobil Chemical Operations P/L SPDA Debottleneck Project   Micropile    
8 No. 7 Chancery Hill   Instrumentation Monitoring Works    
9 Instrumentation works for crack monitoring for upgrading of vehicle bridges at Upper Changi Flyover   Instrumentation Monitoring Works    
10 Proposed Demolition of existing RC trenches for air-con cooling tower pipes discharging to sea front from Marina Mandarin Hotel   Pressure Grouting Works    
11 Proposed temporary stabilization of basement exacavation at Kovan station   Soil nailing and micropiling   click here
12 Consultation Services for proposed demolition of existing RC Trenches for Air-con Cooling Tower Pipes discharging to sea front from marina Mandrain Hotel   Consultation services    
13 Instrumentation works at Telok Blangah   Instrumentation Monitoring Works    
14 Hindhede Condominium   Soil Nails    
15 Jalan Dermawan (off Hillview site)   Soil Nails    
16 Instrumentation works at Anchorvale Rd / Sengkang East Way   Instrumentation    
17 Instrumentation works for crack monitoring for upgrading of vehicle bridges at 8 locations   Instrumentation Monitoring Works    
18 Stabilization of basement excavation at lorong slegnat   Stabilization of Basement Excavation    
19 Slope Protection work at bukit batok Neighbourhood 3 contracts 10 to 12 ( Parts(2&3)   Slope stabilization    
20 Load Test on micropile at 301 Yio Chu Kang RD   Load Testing    
21 Proposed Earthworks and soil investigation works for housing development (PhaseII) at Bukit Batok RD   Earthworks and Soil Investigation works    
22 NUH A & E Dept   Instrumentation Monitoring Works    
23 SOP ISBL Compressor Intake Filtration Unit   Micropile    
24 MRT Circle line STAGE 3 C853   Supply of Rockbolts    
25 4 Cluny Hill   Instrumentation Monitoring Works    
26 Improved Development of Jacob Ballast Children's Garden   Instrumentation Monitoring Works    
27 Stabilization of basement Excavation for Proposed Strata Housing at Recreation Lane   Excavation of basement, Stabilization of basement Excavation and instrumentation works    
28 Instrumentation works for Circle line Contract 823   Instrumentation interpretation and analysis