| No. |
Project |
|
Description of works |
|
Project Image |
| |
Year 2005 |
|
|
|
|
| 1 |
Proposed grouting works at MRT Circle line stage 4 C854 project |
|
Grouting |
|
|
| 2 |
Proposed addition of 2 modular operating theaters at mount alvenia hospital |
|
Instrumentation Monitoring Works |
|
|
| 3 |
Exxonmobil Sop 9th Furnace Project-Grouting works |
|
Rent of grouting equipment |
|
|
| 4 |
MRT Circle line Stage 4 C854 |
|
Removable ground Anchors |
|
|
| 5 |
Proposed Erection of a 5 storey building at Sechool of mechanical and aerospace Engineering At NTU |
|
Consultattion works |
|
|
| 6 |
DTSS-Tanah Merah Link Sewer |
|
Jet Grouting |
|
|
| 7 |
Proposed ExxonMobil Chemical Operations P/L SPDA Debottleneck Project |
|
Micropile |
|
|
| 8 |
No. 7 Chancery Hill |
|
Instrumentation Monitoring Works |
|
|
| 9 |
Instrumentation works for crack monitoring for upgrading of vehicle bridges at Upper Changi Flyover |
|
Instrumentation Monitoring Works |
|
|
| 10 |
Proposed Demolition of existing RC trenches for air-con cooling tower pipes discharging to sea front from Marina Mandarin Hotel |
|
Pressure Grouting Works |
|
|
| 11 |
Proposed temporary stabilization of basement exacavation at Kovan station |
|
Soil nailing and micropiling |
|
click here |
| 12 |
Consultation Services for proposed demolition of existing RC Trenches for Air-con Cooling Tower Pipes discharging to sea front from marina Mandrain Hotel |
|
Consultation services |
|
|
| 13 |
Instrumentation works at Telok Blangah |
|
Instrumentation Monitoring Works |
|
|
| 14 |
Hindhede Condominium |
|
Soil Nails |
|
|
| 15 |
Jalan Dermawan (off Hillview site) |
|
Soil Nails |
|
|
| 16 |
Instrumentation works at Anchorvale Rd / Sengkang East Way |
|
Instrumentation |
|
|
| 17 |
Instrumentation works for crack monitoring for upgrading of vehicle bridges at 8 locations |
|
Instrumentation Monitoring Works |
|
|
| 18 |
Stabilization of basement excavation at lorong slegnat |
|
Stabilization of Basement Excavation |
|
|
| 19 |
Slope Protection work at bukit batok Neighbourhood 3 contracts 10 to 12 ( Parts(2&3) |
|
Slope stabilization |
|
|
| 20 |
Load Test on micropile at 301 Yio Chu Kang RD |
|
Load Testing |
|
|
| 21 |
Proposed Earthworks and soil investigation works for housing development (PhaseII) at Bukit Batok RD |
|
Earthworks and Soil Investigation works |
|
|
| 22 |
NUH A & E Dept |
|
Instrumentation Monitoring Works |
|
|
| 23 |
SOP ISBL Compressor Intake Filtration Unit |
|
Micropile |
|
|
| 24 |
MRT Circle line STAGE 3 C853 |
|
Supply of Rockbolts |
|
|
| 25 |
4 Cluny Hill |
|
Instrumentation Monitoring Works |
|
|
| 26 |
Improved Development of Jacob Ballast Children's Garden |
|
Instrumentation Monitoring Works |
|
|
| 27 |
Stabilization of basement Excavation for Proposed Strata Housing at Recreation Lane |
|
Excavation of basement, Stabilization of basement Excavation and instrumentation works |
|
|
| 28 |
Instrumentation works for Circle line Contract 823 |
|
Instrumentation interpretation and analysis |
|
|